Tube Changer Mechanism (TCM) is the safest and economic solution for long sequence Slab casters that demand high productivity with high steel quality. The system is used for quick change of Sub Entry Shroud (SES) without raising the Tundish or stopping the casting process.
Tube Changer Mechanism operate with optimized contact pressure for a metal tight SES change operation. The mechanism is capable for emergency strand shut-off with refractory blank plate.
IFGL offers customised Tube Changer solutions for Slab casters that are extremely safe, have long service life and require minimum running maintenance.